南京麻将作弊器真的吗|南京麻将详细算法
Welcome to Shandong Hongda Technology Group Co., Ltd.!
LNG

LNG-LCNG stations

LNGfillingstationsisdedicatedtotheLNGvehiclefillingstations.LNGfillingstationsaredividedintounloadingprocess,aeratedandregulatedthreebasicprocesses.LNGfillingstationmainequipmentincludesLNGstoragetank...

Detailed
LNG filling stations is dedicated to the LNG vehicle filling stations. LNG filling stations are divided into unloading process, aerated and regulated three basic processes. LNG filling station main equipment includes LNG storage tanks, from the turbocharger, LNG filling machines. LNG storage tank is a double-walled vacuum insulated container, the content is made of austenitic stainless steel, carbon steel outer container, an intermediate insulating layer of expanded perlite and evacuated. The effective volume of the LNG storage tank is 5 ~ 150m3, maximum working pressure of 0.8 ~ 1.6MPa, there are vertical and horizontal. LNG filling station equipment less compact layout, small footprint.
    LCNG refueling stations are low-voltage (0 ~ 0.8MPa), low temperature (-162 ℃ ~ -145 ℃) of LNG liquid pressurized to 20 ~ 25MPa, high pressure liquid into the carburetor air temperature vaporized into compressed natural gas (CNG)
, CNG filling stations to CNG vehicle filling via CNG filling machine. Its main equipment includes: LNG storage tank (cylinder), LNG cryogenic high-pressure pump, high pressure carburetor, CNG gas storage (well, bottles group), the order of the control panel, the sale of gas machines, automatic control systems. Since L-CNG filling stations increased by high pressure LNG pump, carburetor and cylinder sets and other equipment than LNG filling stations has increased its footprint. For the size of 1 × 104 m3 / d stations, which covers an area of at 1000m2.
南京麻将作弊器真的吗 3d试机号 雷速体育在线直播下载 拉伯配资 湖北十一选五 半全场 吉林快三 河南十一选五 河南十一选五 京东智投 南昌股票配资 房地产股票指数 盈牛配资 嘉盛配资 股票资金流向 陕西快乐10分 日本女优色图